Brett Hansen CDT
Well-Known Member
Full Member
- Messages
- 1,683
- Reaction score
- 102
We normally use our Procera Forte to do all of our Zir frameworks. Right now, our Procera Forte is broken so we need to use the DWOS. We have tried to use the DWOS twice before to do a bridge framework and both bridges had poor fits and we were not able to use them. We have had no problems doing single unit copings with the DWOS. Is anyone else using the 3 series DWOS successfully to do zirconium bridge frameworks?