Multple ExoCAD Stations Workflow Streamline Question

T

thetacoman1423

Member
Full Member
Messages
6
Reaction score
0
Currently have two Exocad Stations with each saving their working files onto their own systems. Both have scanners. Looking to getting a 3rd design station. Looking for suggestions or experience with streamlining the workflow. I'm considering having the 3rd design station be the main input/scanner station hosting all the working files. Backups to a NAS.
 
R

rookiee

Active Member
Full Member
Messages
197
Reaction score
12
I would relocate all databases into one in one location, NAS/cloud etc... So everyone can reach files
 
TheLabGuy

TheLabGuy

Just a Member
Full Member
Messages
6,249
Reaction score
817
Create a network drive and then network all your pc's to it. Make sure that exocad output sends the designs to that network drive. Then all your designs are in one drive (seen by all computers, including your milling computers).
 
LuthorCorp

LuthorCorp

Active Member
Full Member
Messages
632
Reaction score
29
If you want the networked database to load in each Exocad make sure that the file path output and file name output match against all the other PC or you will need to manually load them into each exocad and it will be saved in a different format.
 
Top Bottom