Forums
New posts
Search forums
What's new
New posts
Latest activity
Articles
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Forums
Community discussion
Case Presentations
My 5 Powder Production Buildup
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="dentallabcoach" data-source="post: 16130" data-attributes="member: 1455"><p><strong>6 crowns a day</strong></p><p></p><p>I'm looking at the build ups Al has done. Nice work! I used to live in Memphis and had a lab doing 6 porc crowns a day PFM's.</p><p>This is how I ran my day.</p><p></p><p>7:00 am Metal finished todays 6 frames (cast yesterday) and degassed</p><p></p><p>8:00 opaqued 6 frames and begain die trimming</p><p></p><p>9:00 waxed and invested 6 for tomorrows work day</p><p></p><p>10:00 Build 6 porc crowns 1.5 hours and burnout casting ring</p><p></p><p>11:30 cast ring before 12:00</p><p></p><p>12:00 lunch</p><p></p><p>1:00 finish 6 porc. crowns, time 1 hr., crowns were built to close conture</p><p></p><p>2:00 glaze and package</p><p></p><p> Most of my models were poured by my daughter on a part time basis.</p><p>I could finish up models at this time.</p><p> The national average for daily production is 4 crowns a day. I felt good about my daily production. I don't think I could do as many as Al, Like to see how though.</p><p></p><p>Even to do this production I had to be very focused and not disturbed with constant phone calls etc.</p><p></p><p>What do you think? Did I leave out anything?<img src="data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7" class="smilie smilie--sprite smilie--sprite1" alt=":)" title="Smile :)" loading="lazy" data-shortname=":)" /></p></blockquote><p></p>
[QUOTE="dentallabcoach, post: 16130, member: 1455"] [b]6 crowns a day[/b] I'm looking at the build ups Al has done. Nice work! I used to live in Memphis and had a lab doing 6 porc crowns a day PFM's. This is how I ran my day. 7:00 am Metal finished todays 6 frames (cast yesterday) and degassed 8:00 opaqued 6 frames and begain die trimming 9:00 waxed and invested 6 for tomorrows work day 10:00 Build 6 porc crowns 1.5 hours and burnout casting ring 11:30 cast ring before 12:00 12:00 lunch 1:00 finish 6 porc. crowns, time 1 hr., crowns were built to close conture 2:00 glaze and package Most of my models were poured by my daughter on a part time basis. I could finish up models at this time. The national average for daily production is 4 crowns a day. I felt good about my daily production. I don't think I could do as many as Al, Like to see how though. Even to do this production I had to be very focused and not disturbed with constant phone calls etc. What do you think? Did I leave out anything?:) [/QUOTE]
Insert quotes…
Verification
Who makes the popular shade guide?
Post reply
Forums
Community discussion
Case Presentations
My 5 Powder Production Buildup
Top
Bottom