Forums
New posts
Search forums
What's new
New posts
Latest activity
Articles
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Forums
Lab talk, the good, the bad, and the ugly
Equipment
Milling Air and Vacuum
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="Sevan P" data-source="post: 311207" data-attributes="member: 7766"><p>Suction Quadro Ivac getting quadro twin vac for our larger mills.</p><p></p><p>Main Air compressor is a Atals Copco GX4FF builtin dryer, then i have a mcmaster carr brand non refrigerated dryer right before the mills. I also have a older Dryaire unit which they are no longer around. That is in line after our 60 Gal inline storage tank on the second building which drys the air to 3 ops and another mill. Also getting the Automationdirect inline filters with regulators on each mill for the third added layer. Can't state hoe important it is to have 1000% dry air. I have had spndles and valves fail. Also a huge key to aid in all this are automated electronic dump valves on the bottom of the compressor to open every 20min for a 8 o 10 sec duration. This will dump any built up water in the bottom of the tank.I also have a reserve tank right before the mill and the third dryer right before the mills is on the output of that, this aids in keeping constant air to the mills when everyone is using high speed and stuff, it made a difference.</p><p></p><p>Auto drain valves are located on the main compressors tank, The spare 60 gallon tank and the dryer on the spare tank.</p><p></p><p>[ATTACH]34243[/ATTACH][ATTACH]34242[/ATTACH][ATTACH]34241[/ATTACH][ATTACH]34244[/ATTACH]</p></blockquote><p></p>
[QUOTE="Sevan P, post: 311207, member: 7766"] Suction Quadro Ivac getting quadro twin vac for our larger mills. Main Air compressor is a Atals Copco GX4FF builtin dryer, then i have a mcmaster carr brand non refrigerated dryer right before the mills. I also have a older Dryaire unit which they are no longer around. That is in line after our 60 Gal inline storage tank on the second building which drys the air to 3 ops and another mill. Also getting the Automationdirect inline filters with regulators on each mill for the third added layer. Can't state hoe important it is to have 1000% dry air. I have had spndles and valves fail. Also a huge key to aid in all this are automated electronic dump valves on the bottom of the compressor to open every 20min for a 8 o 10 sec duration. This will dump any built up water in the bottom of the tank.I also have a reserve tank right before the mill and the third dryer right before the mills is on the output of that, this aids in keeping constant air to the mills when everyone is using high speed and stuff, it made a difference. Auto drain valves are located on the main compressors tank, The spare 60 gallon tank and the dryer on the spare tank. [ATTACH alt="24119.jpg"]34243[/ATTACH][ATTACH alt="20171102_132624.jpg"]34242[/ATTACH][ATTACH alt="20191010_140825.jpg"]34241[/ATTACH][ATTACH alt="31e2ylitL8L._AC_.jpg"]34244[/ATTACH] [/QUOTE]