Forums
New posts
Search forums
What's new
New posts
Latest activity
Articles
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
New posts
Search forums
Menu
Log in
Register
Install the app
Install
Forums
Lab talk, the good, the bad, and the ugly
Porcelain
Emax Blockout A4 stump for desired A1
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="Marcusthegladiator CDT" data-source="post: 111242" data-attributes="member: 7071"><p>I can and have before. But I don't have time here. And my talent shines elsewhere and not in porcelain.</p><p>We have vita kits laying around and I could build and finish plenty each day. But we don't use vita, we use noritake and I just don't have time to learn it. I do on occasion finish the emax when my ceramist is backed up. Porcelain is the only thing in the lab you have to do start to finish and my production is interrupted at least once every 30 minutes all day everyday. It was a problem the previous ceramist had, he would be halfway through stacking an anterior bridge and would be called to another office or bothered by visiting reps or have to do something else on the fly... But if we grow and I'm a bit more free to sit in one place for enough time to do porcelain work, I shall.</p></blockquote><p></p>
[QUOTE="Marcusthegladiator CDT, post: 111242, member: 7071"] I can and have before. But I don't have time here. And my talent shines elsewhere and not in porcelain. We have vita kits laying around and I could build and finish plenty each day. But we don't use vita, we use noritake and I just don't have time to learn it. I do on occasion finish the emax when my ceramist is backed up. Porcelain is the only thing in the lab you have to do start to finish and my production is interrupted at least once every 30 minutes all day everyday. It was a problem the previous ceramist had, he would be halfway through stacking an anterior bridge and would be called to another office or bothered by visiting reps or have to do something else on the fly... But if we grow and I'm a bit more free to sit in one place for enough time to do porcelain work, I shall. [/QUOTE]
Insert quotes…
Verification
Who makes the popular shade guide?
Post reply
Forums
Lab talk, the good, the bad, and the ugly
Porcelain
Emax Blockout A4 stump for desired A1
Top
Bottom